Sunnyside Road Widening and Improvement Project, Phase 1 through 4, Clackamas Oregon - Performed final design noise analysis and noise wall placement for the Sunnyside Road Projects, Phases 1 through 4. The Sunnyside Road Widening Phase I project includes constructing a continuous five (5) lane section from I-205 to Sunnybrook Blvd. at 108 Avenue and a seven (7) lane section from Sunnybrook to 122nd Avenue. The project includes rerouting adjacent streets and frontage roads, intersection improvements, drainage facilities, landscaping, street lighting, sound walls, and a new bridge crossing Mt. Scott Creek.
Sunnyside Road Widening Phase 2 will widen Sunnyside Road to five lanes from the end of the current Sunnyside Phase I construction (I-205 to 122nd) to SE 142nd. The roadway will be realigned between SE 136th and SE 140th for safety reasons and will have an added bike lane and sidewalks on both sides of the roadway. A new bridge will be constructed over Sieben Creek, and sound walls will be constructed along residential areas.
Phase 3 & 4 will widen Sunnyside Road to five lanes, with bike lanes and sidewalks, from SE 142nd to SE 152nd and SE 152nd to SE 172nd respectively, and will be constructed as funding becomes available.
Mill Plain Boulevard Extension, Vancouver, Washington - Performed noise study for the environmental impact statement for the extension of Mill Plain Boulevard. Performed traffic noise analysis in accordance with FHWA and WSDOT regulations. Proposed mitigation measures in the form of depressed roadways and noise barriers. Samples of the noise barriers, including a pedestrian access point are shown below.

Oleson Road Improvement Project, Washington County Oregon - Performed noise study for the widening and improving of Oleson Road in Washington County Oregon. Performed traffic noise analysis in accordance with FHWA and Washington County regulations.
192nd Avenue Extension, Vancouver,
Washington - Performed noise study for the environmental
impact statement for the extension of 192nd Avenue. Performed
traffic noise analysis in accordance with FHWA and WSDOT
regulations. Proposed mitigation measures in the form
of depressed roadways and noise barriers.
Pain Filed Boulevard, Clark County,
Washington - Performed noise study for the environmental
impact statement for the construction of a proposed
major east-west by-pass. Performed traffic noise analysis
in accordance with FHWA and WSDOT regulations. Proposed
mitigation measures in the form of depressed roadways
and noise barriers. Worked on several phases of the
proposed project
Ward Road Improvement Project, Clark
County, Washington - Performed noise study for
the environmental impact statement for Planed improvements
to Ward Road. Performed traffic noise analysis in accordance
with FHWA and WSDOT regulations. Proposed mitigation
measures in the form of depressed roadways and noise
barriers.
125th Avenue Extension, Beaverton
Oregon - Task manager for a noise analysis of
extending 125th Avenue in Beaverton Oregon. Analysis
requirements included measuring existing noise environment
along 125th Avenue and three other major arterials.
Predicting noise impacts along the new proposed route,
and calculating noise reductions along other arterials
due to the construction of the extension. Interfaced
with client, attended public and city meetings, and
authored noise technical report.
Burton Road Improvements, Phase 1
and 3, Vancouver Washington - Task manager for
noise analysis of the widening of approximately 6 miles
of Burton Road in Vancouver Washington. Measured existing
noise environment, predicted future noise levels after
the widening, and proposed noise mitigation in the form
of noise barriers. Authored noise technical report.
Paine Field Boulevard - SR 525 Improvement,
Everett, Washington - Performed noise study for
the environmental impact statement for the addition
of Paine Field Boulevard or widening of SR 525. Performed
traffic noise analysis in accordance with FHWA and WSDOT
regulations. Proposed mitigation measures in the form
of depressed roadways and noise barriers.
Jacksonville Bypass, Jacksonville
Oregon - Task manager for a preliminary noise
screening of a proposed highway that would bypass Jacksonville
Oregon. Calculated noise levels at 10 test receiver
locations and performed noise mitigation analysis.
87th Avenue Extension, Vancouver,
Washington - Performed noise study for the environmental
impact statement for the extension of NE 87th Avenue
and subsequent joining with NE 86th Avenue. Performed
traffic noise analysis in accordance with FHWA and WSDOT
regulations. Proposed mitigation measures in the form
of noise barriers.
Highway 26 Widening, Oregon Department
of Transportation - Performed 24-hour, continuous
construction noise monitoring for a residential area
during the construction and widening of Highway 26.
Performed ambient noise monitoring, calculated reduction
factors for the neighborhood and determined optimal
sound level meter placement for noise monitoring. Made
weekly reports and analysis of data, attended public
meetings, and conducted a workshop on sound level meter
care and operation.
Beltline Highway Improvement, Eugene,
Oregon - Performed noise study for the environmental
impact statement for the improvement of Beltline Highway.
Performed traffic noise analysis in accordance with
FHWA and ODOT regulations. Proposed mitigation measures
in the form of depressed roadways and noise barriers.
Fruit Valley Road Improvements, Vancouver,
Washington - Performed Technical noise assessment
for improving Fruit Valley Road. Performed traffic noise
analysis in accordance with FHWA and WSDOT regulations.
Proposed mitigation measures and calculated noise levels
inside Fruit Valley Elementary. |